NexGen Modular Camp Installation
NexGen Modular Camp Installation
Project Description:
Design and Installation of new 600V Power Distribution System for Camp Accommodations.
Scope of work:
The installation of Camp Modules and Interconnects included systems such as Fire Alarm, Emergency & Egress Lighting, a Communications System, and Power. Also included in this scope was Potable Water and Fire Water Systems and Commissioning.